Radisson Blu Stansted Airport

Safety anti-slip resin application to loading bay

Find out more about this service

Materials Used

Gripmaster installed at 2mm fully broadcast with a 0.7-1.2 pigmented quartz.

Gripmaster is an advanced flooring system that employs Methyl Methacrylate Resin (MMA) to create an ultra-strong, long-lasting solution for both pedestrian and vehicular traffic. With a rapid drying time of only 60 minutes, this system is designed to expedite the flooring process while still providing exceptional durability. Gripmaster boasts superior resistance to abrasion, impact, and chemical exposure, making it an excellent choice for high-traffic areas like industrial facilities, warehouses, and workshops. It is also highly popular in commercial settings like hotels, hospitals, laboratories, and food processing plants, thanks to its hygienic properties and easy maintenance. Available in a wide range of colours and finishes, Gripmaster provides plenty of design flexibility, allowing you to tailor your flooring to suit any aesthetic.

  • Hard-wearing
  • Seamless, hygienic finish
  • Excellent chemical resistance
  • Wide choice of colours
  • Anti-slip

Optional coving

Work Undertaken

After mechanically preparing the substrate Gripmaster Primer was applied, followed by installation of the Gripmaster Resin coat at 2mm that was fully broadcast with pigmented quartz measuring 0.7-1.2 in size. Once the loose quartz was swept and collected, two coats of MMA Sealer were added.

Challenges

In order to minimise disruption to the loading bay, the hotel required a quick turnaround. Consequently, our installation team commenced work at 10pm and toiled through the night to complete the task.

Outcome

Rapid curing meant the floor was ready to resume operations and begin receiving deliveries at 5am the next morning.